Version 2.2.1

New:

  • Added a branching system for schedules. This allows for creating a schedule branch that can be worked on separately from the parent schedule. If these changes should be implemented in the parent schedule there is an option from the project schedules list on the context menu to override the parent schedule with this version. Be careful using this option if changes were made in the parent schedule since the branch was created, these changes will be set to deleted. (It is not merging changes to parent schedule, but a completet override, only keeping the original ids of the parent schedule, so that the integration with Tactplan Control is not disrupted).
  • Added a code field for tasks, this can visually be enabled or disabled on subtask level in the task details sidemenu.
  • Introduced location delay calculation when added dependencies in the Takttime view across different locations. This allows for more advanced location structures for non paced tasks.

Improvements:

  • Updated the amount of data that is shared across Tactplan Schedule and Control. This includes calendar, quantities and cost.

Bugfixes:

  • [Hotfix 3/5] Fixed multiple issues with calculating and displaying resources in the resource panel for takttime and flowline views.
  • [Hotfix 31/5] Fixed an issue with updating unit for costs.

Har du spørgsmål?

Du kan altid kontakte os på info@tactplan.com.
Vi tjekker vores indbakke ofte.

Bliv 20% hurtigere end dine konkurrenter

Kom foran dine konkurrenter i dag ved at bruge Tactplan's planlægningsfunktioner til at optimere din tid på pladsen. Få en gratis prøveperiode i dag og en personlig introduktion.
Construction crew standing outside with a great overview of their plan