Version 2.2.1

New:

  • Added a branching system for schedules. This allows for creating a schedule branch that can be worked on separately from the parent schedule. If these changes should be implemented in the parent schedule there is an option from the project schedules list on the context menu to override the parent schedule with this version. Be careful using this option if changes were made in the parent schedule since the branch was created, these changes will be set to deleted. (It is not merging changes to parent schedule, but a completet override, only keeping the original ids of the parent schedule, so that the integration with Tactplan Control is not disrupted).
  • Added a code field for tasks, this can visually be enabled or disabled on subtask level in the task details sidemenu.
  • Introduced location delay calculation when added dependencies in the Takttime view across different locations. This allows for more advanced location structures for non paced tasks.

Improvements:

  • Updated the amount of data that is shared across Tactplan Schedule and Control. This includes calendar, quantities and cost.

Bugfixes:

  • [Hotfix 3/5] Fixed multiple issues with calculating and displaying resources in the resource panel for takttime and flowline views.
  • [Hotfix 31/5] Fixed an issue with updating unit for costs.

Got any Questions?

You can can always contact us at info@tactplan.com.
We check our inbox frequently.

Become 20% Faster than your Competitors!

Get ahead of your competitors today, by utilizing Tactplan's scheduling features to optimize your time on-site. Get a free trial today and a personal introduction.
Construction crew standing outside with a great overview of their plan