INDUSTRIES

Trade Contractors

Achieve deadlines and optimum workflow as a Trade Contractor with Takt time Planning.

Experience Improved Efficiency
and Working Environment

Location-based scheduling, also referred to as takt time planning, has garnered positive feedback from both general contractors and trade contractors. This is primarily due to its substantial impact on safety and the working environment at construction sites.
Through optimising work allocation and the elimination of activity clashes, trade contractors can effectively meet their deadlines without requiring additional manpower. Consequently, location-based scheduling proves to be a valuable tool in enhancing project efficiency and ensuring a smooth workflow.
TACTPLAN BENEFITS

4 Reasons to use Tactplan

Optimize Work and meet Deadlines
Optimise work and meet deadlines without increasing the workforce through location-based scheduling.
A construction worker besides a transport platform
Ensure a Smooth Flow of Work
Ensure a smooth flow of work for trade contractors by eliminating activity clashes and providing dedicated time and space.
A crane seen from below
Increase Efficiency and Minimise Wasted Time
Increase efficiency and minimise wasted time and waiting with data-driven scheduling and visual representations of delays.
A close up of a construction workers toolbelt
Experience a Satisfying Workday
Experience a satisfying workday with peace of mind, orderly job completion and high-quality results.
A construction worker in scaffolding
Construction site in the distance

Data overview with Tactplan Control

Without bringing more men on site, as a trade contractor you can optimise your work and meet your deadlines by exploring every corner of the construction site and ensuring that no activities collide. This creates a conducive environment for all trade contractors to work in a smooth flow without any disturbance, enabling them to maintain a good pace.

Boost Efficiency with Dedicated Workspaces and Takt Time Planning

As a trade contractor, you will be able to perform your work with greater peace of mind as you no longer need to hop randomly around the site in search of a free corner to work. You will have a designated space and the time you need for your tasks, allowing you to finish your job in an organised manner with ample time and without being disturbed.
Construction site with an almost finished building

Any Questions?

You can always contact us at info@tactplan.com.
We check our inbox frequently.

Become 20% faster than your competitors!

Get ahead of your competitors today by utilising Tactplan’s scheduling features to optimise your time on site. Get a free trial today and a personalised introduction.
Construction crew standing outside with a great overview of their plan