This training video focuses on how to effectively use the Takt Time Plan for structuring building projects, using the "Exigo house" project as an example. It starts by explaining how to divide a building into different locations such as staircases, levels (like foundation, basement, and roof), and even apartments if needed.
Key points include:
- Location-Based Scheduling: Before scheduling can begin, it’s crucial to establish a location breakdown structure for the project, which involves dividing the building into functional areas like staircases and levels.
- Creating Location Levels: Location levels should be established hierarchically, starting from the entire project down to specific floors or areas within the building.
- Editing and Adding Locations: The video demonstrates how to add new locations and edit existing ones, emphasizing the importance of a logical structure for efficient project management.
- Using Taktplan Tools: It provides a tutorial on using the Taktplan interface to organize and visualize the location structure within the project, including the use of flowline and takt time features for detailed planning.
The video is a comprehensive guide aimed at professionals in construction project management, focusing on the practical application of location-based scheduling to enhance planning accuracy and efficiency. For more information, viewers are encouraged to visit Tactplan.com.