This video from Tactplan provides a tutorial on how to create tasks across all locations in the takt time view, an essential feature for managing tasks uniformly across different segments or phases of a project.
Key points include:
- Entering Add Mode: To start adding tasks, users must first switch to the "add mode" in the takt time view. This mode is specifically designed for task input.
- Choosing a Location Level: Users need to select the location level where they want to add tasks. This level determines the scope within which the task will appear.
- Adding Tasks to All Locations: By pressing within the schedule area at the chosen location level, a task will be automatically added to all locations associated with that level, ensuring uniform task distribution.
- Adjusting Task Distribution: If the task does not need to appear in all locations, users can navigate to the locations tab and deselect any locations that are irrelevant. This allows for customization of task placement based on specific project needs.
- Finalizing Task Settings: Once the locations are adjusted, the task settings can be finalized, including duration adjustments for selected locations.
This feature is particularly useful for project managers looking to apply uniform tasks across multiple areas of a project efficiently, enhancing overall project management and scheduling precision.