Version 2.1.1

New:

  • New cost view for setting up cost plans or estimates with user-defined cost breakdown structure.
  • Calculate the base cost based on quantities, taking into account consumption and waste factors.
  • Calculate the total amount, taking into account markup factor.
  • Calculate emissions based on quantities.
  • Import cost plans in CSV format from a spreadsheet.
  • Export cost plans to a CSV file or copy the data to the clipboard.
  • Link quantities to cost items to get a source quantity.
  • Link tasks to cost items to get the cost distributed on the locations of the task and by their distribution.

Improvements:

  • The selection of tasks has been updated to be more performant, which will slightly improve the performance across all schedule viewer.
  • Minor changes has been introduced in various places across the schedule viewer pages to improve the general performance. Loading happens before entering a schedule now, for a better loading flow, which also reduces load times of schedules.

Bugfixes:

  • Fixed an issue with drag button mode not disabling when in single use mode.
  • Fixed several rare issues that could send errors to the user and prompt a request to refresh.

Any Questions?

You can always contact us at info@tactplan.com.
We check our inbox frequently.

Become 20% faster than your competitors!

Get ahead of your competitors today by utilising Tactplan’s scheduling features to optimise your time on site. Get a free trial today and a personalised introduction.
Construction crew standing outside with a great overview of their plan